Ahlat Karahasan Malazgirt Road Project – Turkey

Tender has been issued by KGM- Turkish Government Motorways & Highways Agency and Ersa has gotton Letter of Award to construct the road.The total length of the road is 54km including earthworks, retaining walls, cement stabilisation, stonebase, binder base, hot recycling – asphalt pavement, drainage works, culverts, river bed protection walls, gabion walls, bridges, median, walkways, intersections, round abouts and filling station – bus stop area. The project has been completed in 21 Months with protective barriers, road signing and traffic signalisation although Ersa had bad weather conditions during the construction period.

Catégories
Projets achevés

Starlight Conventions And Spa Hotel Project – Turkey

Located close to Lyra Park Shopping, Starlight Convention Center Thalasso & Spa Hotel offers an aqua park, a sundeck and an outdoor swimming pool. The venue consists of 7 storeys with 811 modern rooms that totally carries ERSA touches with its high quality standards. The hotel is Overlooking Beautiful Mediterranean Coast with 300meter seaside. Although it is a resort hotel, it also accomodates business environment with its conference halls and meeting rooms that constructed by Ersa.

Catégories
Projets achevés

Plaza Istanbul Project – Turkey

The Hotel has been constructed at 1990s and renovated by ERSA at 2012 only within 9 Months. After renovation has completed hotel became
a member of ACCOR Group then The name of the hotel has changed as Mercure Istanbul The Plaza Bosphorus Hotel. The venue consists of 20
storeys with 240 non-smoking rooms. This unique hotel is set in the centre of Istanbul.

In the new concept, Every room is fitted with an in-room safe, a coffee machine and a work desk. They offer views of the bay. Nice touches to
enhance your stay include showers, a hairdryer and toiletries.

Catégories
Projets achevés

Volga Premium Hotel Project – Russia

The four-star Volga Premium Hotel is located within the historical and cultural downtown of Cheboksary.

Once Cheboksary’s main hotel, it was demolished in the middle of 20th century, due to the construction of the Cheboksary hydropower station. Desire to return the central part of the town historical appearance get inspired the owner of the hotel to reconstruct the image and the facade of the Volga Hotel were restored to be the true landmark of Cheboksary. Ersa has completely worked on Final Finishing works including furniture and equipment for 100 rooms, restaurants, cafes, bars, corridors, relaxation areas and business center. August 17, 2011 the official opening day of Volga Premium Hotel, is also the Town Day.

Catégories
Projets achevés

Mercury Hotel Project – Russia

The hotel Ideally located in the downtown area and within walking distance of Nizhny Novgorod Kremlin, Bolshaya Pokrovskaya Street, the city’s main attractions, and office buildings. ERSA has constructed that Modern hotel with 80 comfortable rooms is the perfect destination for both business and leisure trips only within ten months.

Catégories
Projets achevés

Projet Hôtel Marriott – Ankara – Turquie

Hotel is located in the city center of Ankara. ERSA’s contract scope has included FF&E works of 413 luxury rooms, 17 flexible meeting rooms and ball rooms, relaxing fitness center and spa that offering indoor and outdoor pool, luxury soa treatments and a fully equipped gym. ERSA has delivered his scope only with in 11 Months.

Catégories
Projets achevés

Batumi Sheraton Hotel Project – Géorgie

Sheraton Batumi is located in the heart of the city, next to the famous Batumi Boulevard and the Black Sea beach, just in few minutes walking distance to the historic center and within easy reach to the international airport and the train station. Located in the very heart of Batumi, the hotel’s gracious building is visible from every corner of the city and is called “White Pearl “ of the Black Sea region. It is located near the local landmarks and historic Batumi Boulevard, famous for its long promenades and dancing fountains. Ersa has completely worked on Final Finishing works including furniture and equipment for 300 rooms, cafe bars, spa and fitness center, meeting rooms, ball room and general areas in 2017.

Catégories
Projets achevés

BatumIbis Hotel Cheboksary

Ibis Cheboksary Center is located in the business and cultural center of the city near Cheboksary Bay, close to the main sights, theaters and museums. Cheboksary, Chuvash capital and large port on the Volga river, is the economic and cultural center of the region. Each of the 110 rooms of the hotel has a modern design and excellent sound proofing. The hotel has three conference rooms. . Ersa has completely worked on Final Finishing works including furniture and equipment for all the rooms, common areas, and meeting rooms in 2016 only in 7 Months.

Catégories
Projets achevés

Projet de l'Hôpital universitaire international de Batoumi, Géorgie

BAU Hospital’s Total Construction Area is 10.285m2. Project has started at March 2014 and completed at February 2015. The Client is System Construction, Istanbul. The Hospital has 56 Beds for Patients, 21 ICU beds, New Born ICU 5 beds. It is fully equipt hospital. There are totally 18 departments available in the policlinics including internal medicine, general surgery, pediatrics, gynecology and obstetrics, cardiology cardiovascular surgery, thoracic surgery, respiratory disease, orthopedics, urology, otorhinolaryngology, ophthalmology neurology, neurosurgery, dermatology, physiotherapy, psychiatry and dentistry. Building has 70pcs car parks. The Project has been constructed by ERSA as EPC and Equipt.