Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
Construction Of Super Highway Roads Crossriver State, Nigeria - Wazobia Set
Категорії
Завершені проекти

Будівництво супермагістральних доріг Crossriver State, Нігерія

Super Highway Project connects Bakkasi Deep Seaport to Abuja and North Nigeria. The Road has been planned as 6 lanes. ROW of the road has been realized at 100mt width. ERSA has mobilized to the project in early 2020. The road is 270km that will be constructed as 3 phases. In the First Phase ERSA has been awarded for 60km road including Africa’s first Spagetti Flyover, Intersections, Bridges and overpasses. Proposed timeline for the project is 44 Months. Road will be financed by the State Government leaded by Nigeria’s Digital Governor Prof. Ben Ayade. It is a toll road will be maintained and managed by ERSA.

Залишити відповідь

Ваша e-mail адреса не оприлюднюватиметься. Обов’язкові поля позначені *