Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
Road Modernization Project Lutendele – Drc - Wazobia Set
Kategoriler
Under Development Projects

Road Modernization Project Lutendele – Drc

The project is part of the opening up of neighborhoods and cities in the city of Kinshasa. The districts of Mbudi, Mazal and Lutendele were cut off from the surrounding populations with this road project.

At the beginning of the design of this project, a special focus was placed on project details such as Drainage structures (chutes) and engineering structures (culverts and culverts) and the construction of a 58 m span bridge over the Binza River.

The locality of Lutendele is full of enormous economic potential due to the fact that it is an agricultural area where there are several farms; The construction of this road will open up this area and facilitate trade between the districts of the urban-rural commune of Mont Ngafula and the city center. This road is a shortcut to Congo Central province from Pompage, its construction will relieve congestion on the Laurent Desire Kabila road, the UPN roundabout and the RN1 at Matadi Kibala. Its construction will help improve the living conditions of the local population and will facilitate movement and accessibility to economic centers, educational establishments and other centers of activity in the city.

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir