Kategoriler
Devam eden projeler

Beli Manastir Wastewater Treatment – Croatia

Project scope includes the expansion of the existing UPOV with a capacity of 8,000 ES and the current II. purification stage to a final capacity of 16,000 ES is III. degree of treatment with the construction of a plant for solar drying of sludge from the waste water treatment process.

The works are contracted according to the terms of the contract for installation sand design and construction for electrical and mechanical buildings and works according to the Contractor’s projects (FIDIC Yellow Book)

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir