Završeni projekti

Projekt Kongresne dvorane Tripoli - Libija

Projekt sadrži 434 luksuzna stana i 24 luksuzna penthousea. Ukupna površina izgradnje iznosi 110.000 m2. Izgradio ga je
Ersa je kao vlastito ulaganje u poslovne nekretnine rasprodana. Rok izgradnje je 47 mjeseci. Rezidencija ima 5 podzemnih etaža koje je Ersa Team sagradio visokotehnološkim geotehničkim inženjeringom. Ima moderan i održiv arhitektonski dizajn koji pokazuje viziju i kulturu ERSA -e.

Kategorije
Završeni projekti

Projekt hotela Sirte - Libija

After the decision has been taking to carry African Summit Meetings to Sirte instead of Tripoli by Ghaddafi’s Government in 2009, very challenging period started for Ersa to finalize too many contracts in a very limited time. The hotel project has been constructed for the African Leader’s teams, hotel has been designed as Light Gauge System to be prefabricated in a shorter time. The production has been done in Istanbul and Installation has been completed only in 5 months as Turn Key. 3 floors, 750 beds, 5 star hotel has been constructed by using LGS and furnished by ERSA for System Construction in Sirte, Libya.

Kategorije
Završeni projekti

Vip Hall Hall & 54 Villas Project - Libija

African Summit Meetings, Sirte 2009 has been accommodated by this luxury VIP Meeting hall that constructed by ERSA for System Construction only in 5 Months. Meeting Hall has been constructed as Steel Structure while the villas are LGS. Over 900 workers and technical team members have been worked at the same time to meet the Client expectation for the time challenge. Presidents joined the meetings have used the villas for accommodation and office purposes for the meeting period.

Kategorije
Završeni projekti

Zgrada terminala Vip Lounge & Kontrola zraka i Operacijski toranj za zračnu luku Sirte - Libija

Za sastanke na vrhu afričkog summita Sirte 2009. mala lokalna zračna luka Sirte obnovila je Ersa u roku od 5 mjeseci kako bi se smjestila međunarodna
flights. New terminal building with VIP Lounge has been constructed as Steel Construction, kalzip roofing with glazing facade coverings. Air control tower has been rehabilitated and recovered while new operational softwares and systems have been installed. Runway and apron floor concrete have been poured by using Massenza concrete pavers.

Kategorije
Završeni projekti

Projekt tornja nebodera Porta Batumi - Gruzija

Projekt se nalazi u srcu Batumija u Gruziji, vrlo blizu mora. Zgrada je 42 spratova+ krovni pod, 3 podrumska kata kao
parkiralište i tehnička područja. Ukupna građevinska površina 120.000 m2 i sadrži stambene stanove, boutique hotel, - luksuzna trgovačka područja, urede i blagovaonice. Sa svojim visokim stropovima od 3,30 metara, Porto Batumi Tower dobar je rezultat korištenja visokotehnoloških stupova i metodologija gradnje.

World-class design by award-winning UK architects Broadway Malyan brought international standard that realized by ERSA’s high quality work only in 43Months. The Tower is being developed by System Construction, a leading Turkish contractor and developer that has constructed landmark properties in locales from the Gulf States to Russia. Combining a cutting-edge design esthetic with the latest structural engineering techniques and construction materials, Porta Batumi Tower is a landmark for ERSA’s construction skills.

Kategorije
Završeni projekti

Projekt Marmaris Resort Hotel (fortezza Beach Resort) - Turska

Ima kapacitet od 320 soba, koji se nalazi u privatnoj uvali u Marmarisu - Çubucak. Ima 850 m dugu plažu. Udaljenost od zračne luke udaljena je samo 1 sat. Naši su objekti među najpopularnijim objektima u regiji. Projekt je Ersa izgradila kao vlastitu investiciju. Ersa također upravlja hotelom.

Kategorije
Završeni projekti

Projekt ceste Ahlat Karahasan Malazgirt - Turska

Tender has been issued by KGM- Turkish Government Motorways & Highways Agency and Ersa has gotton Letter of Award to construct the road.The total length of the road is 54km including earthworks, retaining walls, cement stabilisation, stonebase, binder base, hot recycling – asphalt pavement, drainage works, culverts, river bed protection walls, gabion walls, bridges, median, walkways, intersections, round abouts and filling station – bus stop area. The project has been completed in 21 Months with protective barriers, road signing and traffic signalisation although Ersa had bad weather conditions during the construction period.

Kategorije
Završeni projekti

Starlight Conventions And Spa Hotel Project - Turska

Starlight Convention Center Thalasso & Spa Hotel nalazi se u blizini shoppinga Lyra Park, a nudi vodeni park, sunčalište i vanjski bazen. Prostor se sastoji od 7 katova s 811 modernih soba koje svojim standardima visoke kvalitete u potpunosti nose dodir ERSA -e. Hotel ima pogled na prekrasnu mediteransku obalu s 300 metara morske obale. Iako je to hotel u ljetovalištu, u njemu se nalazi i poslovno okruženje sa konferencijskim dvoranama i prostorijama za sastanke koje je izgradila Ersa.

Kategorije
Završeni projekti

Plaza Istanbul Project - Turska

Hotel je izgrađen 1990 -ih, a ERSA ga je renovirala 2012. godine samo u roku od 9 mjeseci. Nakon dovršetka obnove hotel je postao
član ACCOR grupe tada je naziv hotela promijenjen u Mercure Istanbul The Plaza Bosphorus Hotel. Mjesto se sastoji od 20
katova sa 240 soba za nepušače. Ovaj jedinstveni hotel smješten je u centru Istanbula.

U novom konceptu, svaka soba opremljena je sobnim sefom, aparatom za kavu i radnim stolom. Nude pogled na zaljev. Lijepi dodiri
uljepšajte svoj boravak uključujući tuševe, sušilo za kosu i toaletne potrepštine.