Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
Batumi Sheraton Hotel Project – Georgia - Wazobia Set
Kategorien
Fertige Projekte

Batumi Sheraton Hotel Project – Georgia

Sheraton Batumi is located in the heart of the city, next to the famous Batumi Boulevard and the Black Sea beach, just in few minutes walking distance to the historic center and within easy reach to the international airport and the train station. Located in the very heart of Batumi, the hotel’s gracious building is visible from every corner of the city and is called “White Pearl “ of the Black Sea region. It is located near the local landmarks and historic Batumi Boulevard, famous for its long promenades and dancing fountains. Ersa has completely worked on Final Finishing works including furniture and equipment for 300 rooms, cafe bars, spa and fitness center, meeting rooms, ball room and general areas in 2017.

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert.