Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
Djibouti Housing Project - Wazobia Set
Categories
Ongoing Projects

Djibouti Housing Project

Project  consists of 4 different types and a total of 3700 building.User requirements and user habits are the most important criteria taken into account while design the project. Concept design was created by using materials that are frequently used in buildings and are easier to access. The project concept was created from single-storey buildings and it was aimed not to spoil the silhouette of the region. As can be seen in the project, each building is designed to meet the requirements by increasing the number of rooms according to the number of users.The buildings can be constructed in the same way with the modular system logic, and with the  flexibility provided by the garden walls, they can be built in groups of 4, 8 or 16 etc. In this way, the construction area can be used in the most efficient way.

Leave a Reply

Your email address will not be published. Required fields are marked *