Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
Ahlat Karahasan Malazgirt Road Project – Turkey - Wazobia Set
Categories
Completed Projects

Ahlat Karahasan Malazgirt Road Project – Turkey

Tender has been issued by KGM- Turkish Government Motorways & Highways Agency and Ersa has gotton Letter of Award to construct the road.The total length of the road is 54km including earthworks, retaining walls, cement stabilisation, stonebase, binder base, hot recycling – asphalt pavement, drainage works, culverts, river bed protection walls, gabion walls, bridges, median, walkways, intersections, round abouts and filling station – bus stop area. The project has been completed in 21 Months with protective barriers, road signing and traffic signalisation although Ersa had bad weather conditions during the construction period.

Leave a Reply

Your email address will not be published. Required fields are marked *