Deprecated: Using ${var} in strings is deprecated, use {$var} instead in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/contact-form-7/includes/mail.php on line 221

Deprecated: Optional parameter $blank declared before required parameter $slider is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/admin/includes/plugin-update.class.php on line 2805

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 68

Deprecated: Optional parameter $item_count declared before required parameter $access_token is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 85

Deprecated: Optional parameter $item_count declared before required parameter $current_photoset is implicitly treated as a required parameter in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/revslider/includes/external-sources.class.php on line 1363

Deprecated: Creation of dynamic property Yoast\WP\SEO\Main::$helpers is deprecated in /var/www/vhosts/wazobiaset.net/httpdocs/wp-content/plugins/wordpress-seo/lib/abstract-main.php on line 65
ErsaAdminConstruction, Author at Wazobia Set - Sayfa 6 / 6
Kategoriler
Tamamlanmış projeler

Bitlis Mutki Kavakbaşı Yolu Projesi – Türkiye

KGM- Turkish Government Motorways & Highways Agency has been awarded ERSA to construct the road.The total length of the road is 40 km including earthworks, retaining walls, deep soil stabilisation, crushed stonebase, binder base, binder course, modified asphalt wearing course, drainage works, culverts, retaining walls, flyovers and bridges, median, walkways, intersections, round abouts and filling station – bus stop area. The project has been completed in 35 Months with protective barriers, road signing and traffic signalisation although Ersa had b2 times tough winter conditions during the construction period.