Categorías
Under Development Projects

Hospital Project Djibouti

Djibouti Private Hospital Projects located in the City Center . Project belongs to the Capital Group one of the biggest Hotel Operator in the Region. Project has located on 7.000 m2 land, total construction area is 2 blocks x 12.000 m2, 24.000 m2, 160 beds capacity, General Ward Hospital. Construction period is 16 months and type of contract is EPC + F. Equipment will be provided by Ersa from Turkey and Germany.

Categorías
Under Development Projects

Oman Hospital Project Muscat – Oman

Project has the status of‘General Hospital Project’with a capacity of 200 beds + 50 emergency beds. Total construction area of the project is 46,319 m2. Project consists of ground + 5 floors (max.) and 1 basement floor, excluding the roof floors.Healt services to be provided for childrens are specially-designed and located in the center of the building.

Categorías
Under Development Projects

Jelsa Housing Project – Croatia

26.000 m² luxury-designed villa project over the Croatia islands. 34 villa complex with special pool and garden areas, public areas like restaurants, sport areas, public pools and kid’s playgrounds.

Categorías
Proyectos en marcha

Semsa Hospital Douala – Cameroon

The hospital located in the Center of Douala. The investor is the private business person has Hotel Investments in the whole Central Africa Region. The Project has been designed by a Turkish Architectural Group for ERSA. ERSA’ s Medical Consultants and Turkish Health Tourism Agency Management has directed the design process. Ersa will construct the project with in next 13 months as EPC Contractor and operate the hospital for the Investor. Project has 65 beds capacity with 16 polyclinics, 4 Operation Rooms, 16 ICU Unit and will give service as General Ward Hospital.

Categorías
Proyectos en marcha

Jizzakh City Railway Project – Uzbekistan

700 m long railway crossing bridge and 4km asphalt road project connecting Islam Kerimov street and M39 road.

Categorías
Proyectos en marcha

Slatina – Croatia Infrastructure Project

El proyecto de infraestructura Slatina contiene 66km de tuberías onduladas por gravedad, 57km de líneas de presión de PE, 5,6km de rehabilitación de las líneas existentes, construcción de tanques de agua de 1.000m3, conexiones domiciliarias, líneas de drenaje, caminos, senderos, ciclovías y paisajismo. El proyecto es un contrato Fidic Redbook y el plazo para el proyecto es de 33 meses.

El proyecto está financiado con fondos de la Unión Europea y se ha concluido el proceso de licitación internacional.

Categorías
Proyectos en marcha

Radisson Blu Banjul Banjul – Gambia

Project has 60 presidential and royal suits alongside 400 luxurious rooms. The five-star hotel will ensure the guests receive a befitting accommodation experience. Additionally, it will diversify our tourism portfolio by providing luxurious accommodation facilities for high-end tourists.

Categorías
Proyectos en marcha

Eno Lecture Hall Complex – Senegal

It has equipment and resources that allow students and the community to have modern infrastructure nearby, thus helping to improve their quality of study and life.

Categorías
Proyectos en marcha

Beli Manastir Wastewater Treatment – Croatia

Project scope includes the expansion of the existing UPOV with a capacity of 8,000 ES and the current II. purification stage to a final capacity of 16,000 ES is III. degree of treatment with the construction of a plant for solar drying of sludge from the waste water treatment process.

The works are contracted according to the terms of the contract for installation sand design and construction for electrical and mechanical buildings and works according to the Contractor’s projects (FIDIC Yellow Book)