Proyecto de la sala de congresos de Trípoli - Libia

The project contains 434 Luxury FLAT and 24 LUXURY Penthouses. The total area of construction is 110.000m2. It has been constructed by
Ersa as its own Commercial Real Estate Investment and sold out. The construction period is 47 months. The residence has 5 underground floors which has been constructed with high technology Geotechnical Engineering by Ersa Team. It has a modern and sustainable architectural design shows ERSA’s vision and culture.

Categorías
Proyectos completados

Proyecto Hotel Sirte - Libia

After the decision has been taking to carry African Summit Meetings to Sirte instead of Tripoli by Ghaddafi’s Government in 2009, very challenging period started for Ersa to finalize too many contracts in a very limited time. The hotel project has been constructed for the African Leader’s teams, hotel has been designed as Light Gauge System to be prefabricated in a shorter time. The production has been done in Istanbul and Installation has been completed only in 5 months as Turn Key. 3 floors, 750 beds, 5 star hotel has been constructed by using LGS and furnished by ERSA for System Construction in Sirte, Libya.

Categorías
Proyectos completados

Proyecto Vip Meeting Hall & 54 Villas - Libia

African Summit Meetings, Sirte 2009 has been accommodated by this luxury VIP Meeting hall that constructed by ERSA for System Construction only in 5 Months. Meeting Hall has been constructed as Steel Structure while the villas are LGS. Over 900 workers and technical team members have been worked at the same time to meet the Client expectation for the time challenge. Presidents joined the meetings have used the villas for accommodation and office purposes for the meeting period.

Categorías
Proyectos completados

Edificio de la terminal VIP Lounge y torre de control y operación del aire para el aeropuerto de Sirte - Libia

For 2009 Sirte African Summit Meetings small local airport of Sirte has been renewed by Ersa within 5 months to accommodate International
flights. New terminal building with VIP Lounge has been constructed as Steel Construction, kalzip roofing with glazing facade coverings. Air control tower has been rehabilitated and recovered while new operational softwares and systems have been installed. Runway and apron floor concrete have been poured by using Massenza concrete pavers.

Categorías
Proyectos completados

Proyecto de la torre del rascacielos Porta Batumi - Georgia

The project is located at the heart of Batumi, Georgia very close to the seaside. The building is 42Floors+ A roof floor, 3 Basement floor as
carpark and technical areas. Total construction area 120.000m2 and contains Residential flats, boutique hotel, – Luxury Shopping Areas, Offices and Dining areas. With its 3.30-meter heigh ceilings, Porto Batumi Tower is a good result of using high technology piling foundation and construction methodologies.

World-class design by award-winning UK architects Broadway Malyan brought international standard that realized by ERSA’s high quality work only in 43Months. The Tower is being developed by System Construction, a leading Turkish contractor and developer that has constructed landmark properties in locales from the Gulf States to Russia. Combining a cutting-edge design esthetic with the latest structural engineering techniques and construction materials, Porta Batumi Tower is a landmark for ERSA’s construction skills.

Categorías
Proyectos completados

Marmaris Resort Hotel (fortezza Beach Resort) Project – Turkey

It has a capacity of 320 rooms, which is located in a private bay in Marmaris – Çubucak. It has 850 mt long beach. Distance from airport is only 1 hour away. Our facilities are among the most popular facilities in the region. The project has been constructed by Ersa as its own Investment. Ersa is also operating the hotel.

Categorías
Proyectos completados

Ahlat Karahasan Malazgirt Road Project – Turkey

Tender has been issued by KGM- Turkish Government Motorways & Highways Agency and Ersa has gotton Letter of Award to construct the road.The total length of the road is 54km including earthworks, retaining walls, cement stabilisation, stonebase, binder base, hot recycling – asphalt pavement, drainage works, culverts, river bed protection walls, gabion walls, bridges, median, walkways, intersections, round abouts and filling station – bus stop area. The project has been completed in 21 Months with protective barriers, road signing and traffic signalisation although Ersa had bad weather conditions during the construction period.

Categorías
Proyectos completados

Starlight Conventions And Spa Hotel Project – Turkey

Located close to Lyra Park Shopping, Starlight Convention Center Thalasso & Spa Hotel offers an aqua park, a sundeck and an outdoor swimming pool. The venue consists of 7 storeys with 811 modern rooms that totally carries ERSA touches with its high quality standards. The hotel is Overlooking Beautiful Mediterranean Coast with 300meter seaside. Although it is a resort hotel, it also accomodates business environment with its conference halls and meeting rooms that constructed by Ersa.

Categorías
Proyectos completados

Proyecto Plaza Istanbul - Turquía

El hotel fue construido en la década de 1990 y renovado por ERSA en 2012 solo en 9 meses. Una vez completada la renovación, el hotel se convirtió en
miembro de ACCOR Group luego El nombre del hotel ha cambiado a Mercure Istanbul The Plaza Bosphorus Hotel. El local consta de 20
pisos con 240 habitaciones para no fumadores. Este hotel único está situado en el centro de Estambul.

En el nuevo concepto, cada habitación está equipada con caja fuerte, cafetera y escritorio. Ofrecen vistas a la bahía. Buenos toques para
Mejorar su estancia incluyen duchas, secador de pelo y artículos de tocador.