Categories
Ongoing Projects

Sedima Tower Dakar – Senegal

The project is located on a plot of land bordered by the boulevard Route de la Corniche and two other minor roads. It directly overlooks the ocean in an area of great transformation for the city of Dakar. The mixed-use tower (high-level residences and offices) consists of 17 floors above ground plus two underground levels. As a high-level building, it will be an integral and significant part of the new urban layout of the city. Long with its evident role as a visual landmark covering long distances, the project also intends to give the tower a ‘playful-theatrical aspect’, strictly related to its architectural conformation. Some elements of the tower, for example, work as parts of an interactive urban scenography with events organized at the base or on the tower itself, such as the lighting element placed between the two vertical blades of the front.

Categories
Ongoing Projects

Emerald Hotel Radisson Collection Project – Nigeria

Radisson Collection is the Highest Segment of Luxury for Radisson Hotel Chain. Emeral Hotel Project is located in Oniru, Lagos, Nigeria. ENL Group owns the hotel. The project has been designed by DIAD, South Africa as 193 Rooms as the most luxury hotel in Africa. Ersa has commenced work February 2020 to construct as Turn Key bases included FF&E. Emerald Hotel project has 17 upper floors plus 2 basement floor. Green color of Emerald meets with gold to furnish all areas including the exterior cladding works to meet the highest luxury standards. Smart Management ELV Technologies on use with Energy Saving AC units and solar power production cells. Project will be delivered only in 14 Months including long shipping & logistic periods. Radisson South Africa is controlling the quality standards to satisfy Radisson’s Expactations.

Categories
Ongoing Projects

Semsa Hospital Douala – Cameroon

The hospital located in the Center of Douala. The investor is the private business person has Hotel Investments in the whole Central Africa Region. The Project has been designed by a Turkish Architectural Group for ERSA. ERSA’ s Medical Consultants and Turkish Health Tourism Agency Management has directed the design process. Ersa will construct the project with in next 13 months as EPC Contractor and operate the hospital for the Investor. Project has 65 beds capacity with 16 polyclinics, 4 Operation Rooms, 16 ICU Unit and will give service as General Ward Hospital.

Categories
Ongoing Projects

Jizzakh City Railway Project – Uzbekistan

700 m long railway crossing bridge and 4km asphalt road project connecting Islam Kerimov street and M39 road.

Categories
Ongoing Projects

Slatina – Croatia Infrastructure Project

Slatina infrastructure project contains 66km gravity corrugated pipelines, 57km PE pressure lines, 5.6km rehabilitation of the existing lines, 1.000m3 water tank construction, home connections, drainage lines, roads, walkways, bike ways and landscaping. The project is Fidic Redbook contract and the time line for the project is 33 Months.

Project is financed by European Union Funding and International bidding process has been concluded.

Categories
Ongoing Projects

Radisson Blu Banjul Banjul – Gambia

Project has 60 presidential and royal suits alongside 400 luxurious rooms. The five-star hotel will ensure the guests receive a befitting accommodation experience. Additionally, it will diversify our tourism portfolio by providing luxurious accommodation facilities for high-end tourists.

Categories
Ongoing Projects

Eno Lecture Hall Complex – Senegal

It has equipment and resources that allow students and the community to have modern infrastructure nearby, thus helping to improve their quality of study and life.

Categories
Ongoing Projects

Beli Manastir Wastewater Treatment – Croatia

Project scope includes the expansion of the existing UPOV with a capacity of 8,000 ES and the current II. purification stage to a final capacity of 16,000 ES is III. degree of treatment with the construction of a plant for solar drying of sludge from the waste water treatment process.

The works are contracted according to the terms of the contract for installation sand design and construction for electrical and mechanical buildings and works according to the Contractor’s projects (FIDIC Yellow Book)

Categories
Ongoing Projects

Jizzakh City Housing Project – Uzbekistan

Center on the city project has 44 social building, 16 luxury buildings, 38 villas, school, hospital, preschool, shopping center, gym, mosque and social areas.